• General_Effort@lemmy.world
    link
    fedilink
    English
    arrow-up
    3
    ·
    8 hours ago

    Natural gas. In the EU that is classified as sustainable, green energy. Or maybe that’s only if it’s sourced from Russia. Common regulatory W.

  • Uriel238 [all pronouns]@lemmy.blahaj.zone
    link
    fedilink
    English
    arrow-up
    10
    arrow-down
    1
    ·
    14 hours ago

    For your edification Climate Town’s video on Methane (Natural Gas) (on YouTube).

    TLDW: Methane was sold to the US as a transition fuel for government subsidies while we invested in renewables. It turns out we weren’t intending to transition after all.

    Natural gas infrastructure is notoriously leaky, though difficult to monitor. (And the NG industry has gone to great lengths to discourage actual oversight, of course.) And methane is an exceptionally nasty greenhouse gas, considerably worse than CO2.

    It also includes a bit about LNG, in which methane is liquified so it can be shipped abroad and other nations can transition to more methane use.

  • Manjushri@piefed.social
    link
    fedilink
    English
    arrow-up
    17
    ·
    1 day ago

    Wouldn’t it be cheaper in the long run to just put solar panels all over the buildings and parking lots, and maybe some surrounding fields, and an array of batteries to run off of at night? Maybe add some wind mills too, seeing as Texas generates a tremendous amount of power with wind already.

    • NotMyOldRedditName@lemmy.world
      link
      fedilink
      English
      arrow-up
      4
      ·
      edit-2
      21 hours ago

      You aren’t thinking about the scale properly.

      “some fields”, “parking lots”, “maybe some windmills” is a wildly vast under estimation of what would be required to do it.

      7.65GW is A LOT.

      The USA doesn’t even have an active 1GWh solar farm today. It’s 900MW, and it is 4600-5000 acres and is 1.3 million panels

      To run batteries off that, you need to 3-4x that would be a 30GWh generation capacity battery to run in the non sun periods and give some buffer for bad weather. Then you need a massive battery as well to store it all. It would need to be able to run at least for a couple days, which means it needs to store 367.2 GWh (48h storage), so my solar numbers above are actually probably wrong since you won’t fill that up in 1 day, but maybe that’s okay if the size is just an emergency amount. 122GWh battery would probably the be minimum for a perfect summer condition 100% of the time day/night cycle.

      The largest upcoming battery installation in the USA is 1.15 GWh, which is not built yet.

      I’m not saying don’t do it, but you’ve really glossed over the sheer scale of it, and I doubt they’d be able to easily put the solar field near the datacenter, so there’s extra costs around transmission lines as well.

      Edit: For 30GW of solar you’re looking at around 153,333 acres, or about the size of Dallas Texas, before the battery storage

      Edit: Updated battery figures

      • Manjushri@piefed.social
        link
        fedilink
        English
        arrow-up
        3
        ·
        8 hours ago

        I concede that my grasp of the scale involved was unrealistic. However, I don’t see a viable solution. The issue, I have realized, isn’t how to generate the power, it’s the scale of power needed to run these data center monstrosities.

        As you say, 7.65 gigawatts is a lot of power. According to ERCOT, Texas just set a new record for power demand in July of 91gw. So this plant, built to supply this one data center complex, will produce power equal to 8.5% as much power as the entire state of Texas required at peak demand this year (so far, anyway). 8.5% of peak demand for the entire state of Texas which, by the way, is the largest energy consuming state. Texas uses about 15% of the total power generated in the entire USA according to EAI.gov.

        So if solar and wind (with batteries, of course) would be very challenging, it is at least vaguely possible. Texas is a great state for wind, solar, and geothermal power. It already generates about 30% of it’s power from renewables. Texas has a lot of sunny days and a lot of open spaces for wind farms particularly in the western parts of the state. I can think of worse ideas than covering all those oil fields with solar panels or wind farms. You wouldn’t even need to stop producing oil. You can do both.

        Nuclear really isn’t viable. Starting the approval process now, it would easily be 20 years before a new plant would start producing power. No one is waiting two decades to open their data center.

        The only other option to power these data centers, the one they are going with, is fossil fuels. That means multiplying the amount of toxic and greenhouse gasses being pumped into our air which is the absolute worst option for everyone on the planet.

        • NotMyOldRedditName@lemmy.world
          link
          fedilink
          English
          arrow-up
          1
          ·
          edit-2
          2 hours ago

          (Lemmy failed to send my original reply and I lost it I think, but if another similar one eventually show up… that’s why)

          I wouldn’t rule nuclear out in the not so far future if SMRs properly come online. I think those could scale up demand at the pace they could build these monstrosities in the not so distant future, like give it another 15 years and it might start being okay?

          And ya, the renewable way IS possible, and Texas would be a good spot for something of this scale, but it would be a huge undertaking. I imagine we would see amazing improvements in solar/battery tech building something like that out with economies of scale and additional research from the huge amount of funding it would create. Also there’s no reason they can’t make them do some % with renewables.

          This is aslo why Space based stuff maybe isn’t as far flung as the idea seems. It obviously requires new tech that doesn’t function yet.

          e.g Starship needs to get down to its targeted $50-$200/kg) which is not a given.
          New chips that can run hotter so the radiator size is reasonable. Cheaper solar panels as space based panels are very expensive right now.

          But with that (and all the other things) you get 7.65GW of power being 7.65GW of power and minimal batteries required. Space solar is more effective as well since there’s no atmosphere, so the panels will be 30% more efficient or something like that than on land. It really does solve some problems, but it obviously creates others.

          (edit: I worked it out once, and at the launch cadence of F9, they could put ~1GW of solar up a year, which would be pretty fast compared to land)

          All that being said, while I don’t doubt they can launch these satellites, being profitable is an entirely other matter, but being profitable on land is also a huge unknown for something of these scales. Like, do they think there’s enough demand for these large quantities of huge datacenters? I’m not convinced this is a, if you build it, they will come situation for LLMs. True AI absolutely, but LLMs not a chance. So ALL of this IMO is betting these insane amounts of money and pollution on something they think they’ll eventually build, not something they have today.

          At least with these land based ones if they take on building the SMRs or massive solar fields, we can repurpose those after. If they do it with natural gas, that’s much less ideal, sure the power might be useful, but we need to move away from it and that is the wrong direction. Space based ones will just flop with no backup benefit.

    • 3sothoth@lemmy.world
      link
      fedilink
      English
      arrow-up
      4
      ·
      23 hours ago

      This power plant is specced to produce 7.65GW. The Alvin W. Vogtle plant in Georgia, the largest nuclear plant in the US, generates only 4.5GW.

    • fartographer@lemmy.world
      link
      fedilink
      English
      arrow-up
      4
      ·
      24 hours ago

      Sure, but first they gotta figure out who owns the sun. How else are they going to inflate their value by aggregating all of the speculative projects they’ll each complete when handed the same $200K cheque that they keep using to pay each other? I mean, is it even business if you don’t lobby for government kickbacks that you’ll get for working together, and then use those kickbacks to buy more politicians?

    • jacksilver@lemmy.world
      link
      fedilink
      English
      arrow-up
      1
      arrow-down
      1
      ·
      16 hours ago

      Data centers need to run 24/7, so you aren’t able to meet the needs with just solar. Additionally Solar is very seasonal (more power during the summer).

      Not saying there aren’t ways to making it work, but one natural gas plant vs a mixture of systems is probably cheaper and easier. Especially since the US is currently built around natural gas power.

    • Forester@pawb.social
      link
      fedilink
      English
      arrow-up
      2
      ·
      1 day ago

      Not enough energy density for a DC. You would need a small nuclear reactor or normal peaker plant.

    • gagcar@lemmus.org
      link
      fedilink
      English
      arrow-up
      1
      ·
      1 day ago

      A single data center is mid double digit MW. They want to build groups of DCs in one location. As someone else said, a nuclear reactor is honestly the most efficient way for them to operate eventually.

      • Tollana1234567@lemmy.today
        link
        fedilink
        English
        arrow-up
        2
        ·
        14 hours ago

        unfortunately nuclear reactors take forever to build up, plus the regulatory approval is very slow. and its expensive to maintain. i dont think the techbros think too long ahead. its not as easy as building a coal/gas powerplant.

        by the time they are done building one nuclear plant AI wouldve bursted by now.

        • Manjushri@piefed.social
          link
          fedilink
          English
          arrow-up
          1
          ·
          9 hours ago

          You’re not wrong. One of the newest reactors to come on line is reactor 3 at Plant Vogtle in GA. After as much as 5 years for the approval process, the reactor broke ground in 2009 and didn’t start producing power until 2023. That’s just shy of 2 decades from start to finish. As much as my wind and solar idea is flawed, nuclear is as much of a non-starter. These folks may want to open their data center a little sooner than 2045.

  • Photonic@lemmy.world
    link
    fedilink
    English
    arrow-up
    26
    ·
    1 day ago

    We don’t know who struck first, us or them. But we do know it was us that scorched the sky.

  • NotMyOldRedditName@lemmy.world
    link
    fedilink
    English
    arrow-up
    2
    ·
    edit-2
    21 hours ago

    Maybe by size, but its natural gas, how is that not better than any of the coal plants in the US. The coal plants seem to top out around 3.5gwh

    Edit: and if could be wrong, but im pretty sure people would rather live near a 7.5gwh natural gas plant, than a 3.5gwh coal one? Not that they’d want to live near either though.

    • xthexder@l.sw0.com
      link
      fedilink
      English
      arrow-up
      4
      ·
      15 hours ago

      I think you’re confusing your units for power vs energy. 3.5GWh (Gigawatt-hours) says nothing about the size of a power plant without also providing a time period that energy was generated in. You likely mean 3.5GW (Gigawatts), which is a measure of instantaneous power (in this case peak power). A 3.5GW plant generates 3.5GWh in 1 hour.

  • melfie@lemmy.zip
    link
    fedilink
    English
    arrow-up
    2
    ·
    1 day ago

    Greenland is going to live up to its name pretty soon at this rate (any part still above water, that is).